• Home
  • >
  • Display
  • >
  • Guangdong Engineering Vocational and Technical College

Guangdong Engineering Vocational and Technical College

This project is located at the Tianhe Campus (main campus) of Guangdong Engineering Vocational and Technical College, which has approximately 10,000 full-time students and over 600 faculty and staff. The goal of this upgrade and renovation is to create a "smart campus" with integrated, unified connectivity, comprehensive, refined services, and secure, convenient management and control, serving students and faculty in their learning, teaching, and entertainment lives.



I. Current Network Status


♦ The original network cabling was complex, impacted by electromagnetic interference and transmission distance, resulting in a poor service experience.


♦ Aging lines: The original network used aging twisted-pair lines, leading to widespread unauthorized wiring and connection.


♦ Difficulty in operation: The coexistence of multiple mobile and telecom networks resulted in a complex architecture and low operational efficiency.


♦ IPv6 network transition issues: Network equipment must support dual-stack IPv4/IPv6 transition capabilities.


II. Customer Requirements


♦ High-speed connectivity


Integrated wired and wireless connectivity for high-speed internet access, data interoperability, and social campus applications.


♦ Convenient Management


Improve campus operational efficiency, achieving low TCO, self-service management, and unified management of multi-network integration.


♦ Secure Campus


Multi-dimensional access authentication, network behavior tracing, network application monitoring, and network attack prevention.


III. Application Solution



♦ Utilizes a large, Layer 2, all-optical network architecture consisting of OLTs and ONUs, with independent fiber optic cables extending to dormitories and integrated ONUs for wired and wireless access. This creates an IPv4 & IPv6 dual-stack platform with unified network management and operations.



♦ Enables smart campus management, including online bill payment, online security acceptance, and visual management.


IV. Construction Results


♦ 10G backbone, 1G to the desktop, for a high-speed, stable network experience.


♦ Reduces failure rate by 80% and reduces operations and maintenance workload by 40%.


♦ Multi-service convergence and unified transport for flexible expansion.

Get the latest price? We will respond as soon as possible (within 12 hours)
captcha